Laufenburg was the original location of the electric-power interconnection of three countries: Switzerland, Germany, and France. The Union for Production and Transmission of Electricity (now UCTE) was formed to manage this interconnection. The installation pioneered international connections, and technical and political cooperation for European integration. UCTE went on to coordinate one of the largest synchronously connected power networks in the world, serving almost all of continental Europe.